首页> 外文期刊>Electrical Engineering >Power station centralized control centralized control for steam power stations
【24h】

Power station centralized control centralized control for steam power stations

机译:电站集中控制蒸汽电站集中控制

获取原文
获取原文并翻译 | 示例
           

摘要

THE ULTIMATE in centralization of instrumentation and controls for a steam electric power station might be considered as only one operator for the whole station; this operator would be sitting in a quiet air-conditioned office with one load indicator and one control to start, adjust the load, and stop each main turbine generator. The boiler for each unit and all other equipment would operate automatically, and the man's only duties would be to operate the load controls in accordance with telephone dinstructions from the system load dispatcher. However, this ultimate in simplification is neither economical nor feasible for present-day steam turbine generators, boilers, and auxiliary equipment.
机译:蒸汽电站的仪表和控制集中化的终极目标可能只是整个电站的一名操作员;该操作员将坐在一间安静的空调办公室中,该办公室配有一个负荷指示器和一个控件,用于启动,调整负荷和停止每个主涡轮发电机。每个单元和所有其他设备的锅炉将自动运行,该人的唯一职责是按照系统负载分配器的电话指示操作负载控件。然而,对于当今的蒸汽涡轮发电机,锅炉和辅助设备而言,这种简化的最终目的既不经济也不可行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号