Scheduling Considerations of the Estimate

机译:计划估算的注意事项

获取原文
获取原文并翻译 | 示例
           

摘要

The site for a new, multibuilding high school project was on a hillside requiring massive grading and rock removal. The buildings were of wood and steel construction and housed six classrooms each. Because of the grading problems, the expected progress of construction would be that the upper units would be graded and constructed first and then the lower buildings. That's the way the project was estimated and this was the general contractor's schedule also. From the outset, there were problems such as the grading contractor declaring bankruptcy, followed by a bankrupt steel contractor.
机译:一个新的,多建筑物的高中项目的场地在山坡上,需要进行大规模的平整和除石。建筑物是木头和钢结构,每个都设有六个教室。由于等级问题,预期的建设进度将是先对上部单元进行分级和建造,然后对下部建筑物进行建造。这就是项目估算的方式,这也是总承包商的时间表。从一开始,就存在诸如等级承包商宣布破产的问题,随后是破产的钢铁承包商。

著录项

  • 来源
    《Electrical contractor》 |2003年第6期|p.20|共1页
  • 作者

    Eric David;

  • 作者单位

    Electrical Technology at Long Beach City College, Calif.;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 电工技术;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号