首页> 外文期刊>Electrical contractor >Duke Energy Tests Solar Panels and New Smart Grid Technology
【24h】

Duke Energy Tests Solar Panels and New Smart Grid Technology

机译:杜克能源公司测试太阳能电池板和新的智能电网技术

获取原文
获取原文并翻译 | 示例
           

摘要

An array of 213 solar panels will soon provide electricity to homes served by Duke Energy's McAlpine Creek substation in south Charlotte, N.C. The substation's new solar panels will provide approximately 50 kilowatts of electricity, enough to power five homes when the panels are operating. Electricity from these panels can be sent directly into the distribution lines serving the McAlpine Creek test area or used to charge a 500-kilowatt storage battery planned for installation at the substation.rnThe solar panels and battery will be used in conjunction with residential energy management systems to determine how Duke Energy can create a "virtual power plant" by combining renewable sources, storage technology and energy efficiency to meet customer needs.
机译:由213个太阳能电池板组成的阵列不久将为北卡罗来纳州夏洛特市杜克能源公司的McAlpine Creek变电站提供服务的房屋供电。该变电站的新太阳能电池板将提供约50千瓦的电力,当这些面板运行时,足以为五所房屋供电。这些面板的电能可以直接发送到McAlpine Creek测试区的配电线路中,或用于为计划安装在变电站中的500千瓦蓄电池充电。rn太阳能面板和电池将与住宅能源管理系统结合使用通过结合可再生能源,存储技术和能效来满足客户需求,确定杜克能源如何创建“虚拟电厂”。

著录项

  • 来源
    《Electrical contractor》 |2009年第8期|23-23|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号