...
首页> 外文期刊>Electrical contractor >Now Available: New Report On 'The Emergence Of The IBS Contractor' Emerges From Research Conducted For ELECTRI International
【24h】

Now Available: New Report On 'The Emergence Of The IBS Contractor' Emerges From Research Conducted For ELECTRI International

机译:现已提供:为ELECTRI International进行的研究提出了有关“ IBS承包商的出现”的新报告

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

It was bound to happen, sooner rnrather than later: The 2004 edition of The Construction Specifications Institute's (CSI) MasterFormat™ is beginning to take hold in the building construction industry and the old sixteen divisions are giving way to an expanded 33 division format. Of particular relevance to electrical contractors, the old Division 15/Mechanical and Division 16/Electrical have been eliminated from the latest Master-Format and replaced with the "Facility Services Subgroup" which includes the following seven divisions:rn1. Division 21 - Fire Suppression.
机译:它必定会早早发生:2004年版的美国建筑规范协会(CSI)MasterFormat™开始在建筑行业中占有一席之地,而以前的16个部门正在让位给扩展的33个部门。与电气承包商特别相关的是,旧的15类(机械)和16类(电气)已从最新的主格式中删除,并由“设施服务子组”取代,该子组包括以下七个部门:rn1。第21分部-灭火。

著录项

  • 来源
    《Electrical contractor》 |2009年第5期|115-116|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号