If you have a problem related to the National Electrical Code (NEC), are experiencing difficulty in understanding a Code requirement or are wondering why or if such a requirement exists, ask Charlie, and he will let the Code decide.rnIs there a Code requirement that specifically states how many single twin breakers are allowed in a panel, or is it a percentage of the breakers in the panel?rnArticle 408.54 requires a panelboard to be provided with physical means to prevent the installation of more over-current devices than the number for which the panelboard was designed, rated and listed.
机译:如果您遇到与国家电气法规(NEC)有关的问题,在理解法规要求时遇到困难,或者想知道为什么或是否存在这样的要求,请查理(Charlie)询问,他将让法规来决定。rn是否存在法规要求408.54第408.54条要求配电盘必须配备物理装置,以防止安装比数量多的过电流设备,具体说明了一个配电盘中允许使用多少个单双断路器,或者占配电盘中断路器的百分比?为此,对面板进行了设计,评估和列出。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号