Making Sense of the Numbers

机译:理解数字

获取原文
获取原文并翻译 | 示例
           

摘要

One of the first steps in performing an arc flash hazard calculation study is to request the short-circuit data from the electric utility company. This information is critical because it defines the magnitude of current that could flow from the utility and is used as a starting point for arc flash calculations. In addition to requesting this data for normal operating conditions, it should also be requested based on minimum short-circuit current conditions, if available. The minimum condition could be for a utility transformer or transmission line out of service or similar scenario. The minimum value can then be used to determine if the lower current could result in a protective device operating more slowly, which may increase the total incident energy during an arc flash.
机译:进行飞弧危害计算研究的第一步之一就是要求电力公司提供短路数据。该信息至关重要,因为它定义了可能从公用事业部门流出的电流的大小,并用作电弧闪光计算的起点。除了在正常操作条件下请求此数据外,还应根据最小短路电流条件(如果有)来请求数据。最低条件可能是公用事业变压器或输电线路停运或发生类似情况。然后可以使用最小值来确定较低电流是否会导致保护设备运行更慢,从而可能增加电弧闪光期间的总入射能量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号