首页> 外文期刊>Electrical contractor >Preplanning, PVC Solution and Streamlining Communication
【24h】

Preplanning, PVC Solution and Streamlining Communication

机译:预先计划,PVC解决方案和简化沟通

获取原文
获取原文并翻译 | 示例
           

摘要

Preplanning is the key to successful and cost-effective conduit runs. The first step is to take a good look at the plans and prints to get an idea of the general layout of the runs and the specifics (e.g., size of conduit, number of J-boxes, number of fittings, etc.). Then, walk along the proposed conduit run path with your smartphone camera ready. Take pictures of any problem areas (e.g., extra or complicated bends, obstacles to bypass, etc.). Discuss with the crew how best to overcome these problems. Obviously, blueprints and the final building structures are often very different. When running pipe, it is nice to know where the problem areas are ahead of time and have the solutions ready.
机译:预先规划是成功且具有成本效益的管道铺设的关键。第一步是仔细看一下平面图和印刷品,以了解管路的总体布局和细节(例如,导管的尺寸,接线盒的数量,配件的数量等)。然后,在准备好智能手机摄像头的情况下沿着建议的导线管运行路径行走。拍摄任何问题区域的照片(例如,额外或复杂的弯头,绕行障碍物等)。与机组人员讨论如何最好地克服这些问题。显然,设计图和最终的建筑结构通常有很大的不同。在运行管道时,很高兴提前知道问题区域并准备好解决方案。

著录项

  • 来源
    《Electrical contractor》 |2017年第5期|70-70|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号