首页> 外文期刊>Electrical contractor >The Hub of Tech Knowledge
【24h】

The Hub of Tech Knowledge

机译:技术知识的中心

获取原文
获取原文并翻译 | 示例
           

摘要

The shipping hub was constructed on a 300-acre site that required electrical infrastructure installation across the entire site, including the main building and support facilities, which added complexity to a large project with a demanding schedule. McPhee Electric was responsible for electrical construction, project management and civil trade management associated with electrical work, said president Marcus McPhee. "Scope of work on the project included all electrical systems and telecommunication infrastructure, encompassing primary and secondary power distribution, lighting, fire alarms, low-voltage controls, rough-in, computer room with static uninterrupted power systems and the security system, including all performance testing and certification," he said.
机译:运输中心在一个300英亩的网站上构建,在整个网站上需要电气基础设施安装,包括主要建筑和支持设施,这为具有苛刻的计划的大型项目增加了复杂性。主席马库斯·麦克彭表示,麦克内电气负责与电气工作相关的电气建设,项目管理和民营管理。 “该项目的工作范围包括所有电气系统和电信基础设施,包括初级和二级配电,照明,火警,低压控制,粗置,电脑室,具有静态的不间断电源系统和安全系统,包括全部性能测试和认证,“他说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号