首页> 外文期刊>Electrical contractor >Mid-City Electric Gets New Ohio State Athletics Complex Up and Running
【24h】

Mid-City Electric Gets New Ohio State Athletics Complex Up and Running

机译:中城市电力公司建立并运行了新的俄亥俄州立体育馆

获取原文
获取原文并翻译 | 示例
           

摘要

In the world of college athletics, having state-of-the-art facilities is crucial. At Ohio State University in Columbus, Ohio, local contractor Mid-City Electric Co. helped to make sure the advanced systems in the university's latest Schumaker Complex were up and running without a hitch. Mid-City Electric, also based in Columbus, provided installation of the technical pathways (cable tray/conduit), as well as structured cabling, wireless access points and sound systems for the low-voltage systems in the new complex, said Michael Colosimo, project manager at Mid-City Electric.
机译:在大学运动界,拥有最先进的设施至关重要。在俄亥俄州哥伦布市的俄亥俄州立大学,当地承包商Mid-City Electric Co.帮助确保该大学最新的Schumaker综合大楼中的先进系统正常运行。 Michael Colosimo说,同样位于哥伦布的Mid-City Electric提供了技术通道(电缆桥架/导线管)的安装,以及用于新系统中低压系统的结构化电缆,无线接入点和音响系统。 Mid-City Electric的项目经理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号