首页> 外文期刊>Electric Power Components and Systems >Evaluation of the Generating Capacity Adequacy of the Saudi Arabian Central Operating Area
【24h】

Evaluation of the Generating Capacity Adequacy of the Saudi Arabian Central Operating Area

机译:沙特阿拉伯中央作业区的发电能力充足性评估

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The goal of the study presented in this article was to evaluate the adequacy of the generation capacity of the Central Operating Area in Saudi Arabia. The generating capacity adequacy was evaluated to examine the ability of the generating capacity of the system to meet the total system demand. Over the last five decades, several probabilistic methods have been developed as a means of conducting such an evaluation. Three probabilistic simulation techniques were used for the evaluation of the designated system for this study: analytical, sequential, and non-sequential Monte Carlo. A variety of reliability indices, such as loss of load expectation and loss of energy expectation, were obtained.
机译:本文提出的研究目的是评估沙特阿拉伯中央作业区的发电能力是否足够。评估发电能力是否足够,以检查系统的发电能力满足总系统需求的能力。在过去的五十年中,已经开发了几种概率方法作为进行这种评估的方法。三种概率模拟技术用于评估本研究的指定系统:分析,顺序和非顺序蒙特卡洛。获得了各种可靠性指标,例如预期的负载损失和预期的能量损失。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号