首页> 外文期刊>Ecos >Traveston Dam Tests Our Environmental Process
【24h】

Traveston Dam Tests Our Environmental Process

机译:Traveston大坝测试我们的环境过程

获取原文
获取原文并翻译 | 示例
           

摘要

Stand in the broad alluvial valley of the wending Mary River and it is hard to imagine its farm paddocks, gum trees and scattered homes submerged under five metres of water.rnBut the Queensland Government is ploughing ahead with plans to build the controversial $1.7 billion Traveston Crossing Dam across the Mary River near the small country town of Kadanga.rnDespite widespread doubts about its economic, environmental and community impact, the government claims the massive 660 000 megalitre two-stage dam is essential to solve the drinking water crisis facing Brisbane and Queensland's rapidly growing south-east region.rnQueensland's independent major projects and environmental regulator, Coordinator-General Colin Jensen, is set to advise the state government before Christmas if the dam, 27 kilometres south of Gympie, should be given the green light and, if so, under what conditions.
机译:屹立在宽阔的玛丽河冲积河谷上,很难想象其农舍,口香糖树和零星的房屋被淹没在五米深的水中.rn但昆士兰州政府正在大力推进计划,以建设有争议的17亿澳元的特拉维斯顿过境点尽管小村庄Kadanga附近的玛丽河上有水坝。rn尽管人们对其经济,环境和社区影响产生广泛怀疑,但政府称66万兆升的大型两级水坝对于解决布里斯班和昆士兰州迅速面临的饮用水危机至关重要昆士兰州的独立大型项目和环境监管机构统筹官科林·詹森(Colin Jensen)将在圣诞节前向州政府提供建议,如果该水坝位于金皮(Gympie)以南27公里处,应该给予绿灯许可;如果可以,在什么条件下。

著录项

  • 来源
    《Ecos》 |2009年第146期|18-21|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号