首页> 外文期刊>Doklady Earth Sciences >A Long-Term Forecast Model of Spring Runoff: The Case of the Belaya River
【24h】

A Long-Term Forecast Model of Spring Runoff: The Case of the Belaya River

机译:春季径流的长期预报模型:以贝拉亚河为例

获取原文
获取原文并翻译 | 示例
       

摘要

The results of long-term forecasting of the spring runoff in the Belaya River basin based on the water-balance model are presented. The structure and parameters of the water-balance model equations are optimized by the Levenberg-Marquardt algorithm with restrictions imposed on the input data values. The obtained values of the equation coefficients are checked according to the Delta/sigma criterion adopted in the hydrometeorological service. The reliability of the forecasting procedure is assessed by statistical calculations of the stability of their parameters and test calculations on the independent sample. All equations obtained during the numerical experiment can be suitable for making forecasts.
机译:提出了基于水平衡模型的贝拉亚河流域春季径流的长期预报结果。 Levenberg-Marquardt算法通过限制输入数据值来优化水平衡模型方程的结构和参数。根据水文气象服务采用的Delta / sigma标准检查方程系数的获得值。预测程序的可靠性通过对参数稳定性的统计计算和对独立样本的测试计算来评估。在数值实验过程中获得的所有方程式都适合进行预测。

著录项

  • 来源
    《Doklady Earth Sciences》 |2019年第2期|724-727|共4页
  • 作者单位

    Ufa State Aviat Tech Univ Ufa 450008 Russia|Russian Acad Sci Obukhov Inst Atmospher Phys Moscow 119017 Russia;

    Ufa State Aviat Tech Univ Ufa 450008 Russia;

    Russian Hydrometeorol Serv Bashkir Dept Hydrometeorol & Environm Monitoring Ufa 450105 Russia;

    Russian Acad Sci Obukhov Inst Atmospher Phys Moscow 119017 Russia|Russian Acad Sci Inst Geog Moscow Russia;

    Russian Acad Sci Ural Branch Steppe Inst Orenburg 460000 Russia;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-18 05:17:04

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号