首页> 外文期刊>Dredging and Port Construction >Prince Rupert port plans to quadruple capacity
【24h】

Prince Rupert port plans to quadruple capacity

机译:鲁珀特王子港计划将容量翻两番

获取原文
获取原文并翻译 | 示例
           

摘要

Authority (PRPA) wilt add up to 7 million teu under a new master plan, with new capacity to be added at its south Kaien Island site, and the west Kaien Fairview terminal. The DP World-operated Fairview terminal, which currently stands at 1.35 million teu, will be increased to 1.8 million teu by 2022, under an agreement with the terminal giant made in 2018. However, devised in partnership with infrastructure consultant AECOM, a new plan calls for a new 2.5 million teu terminal development at the southernmost point of Kaien Island. These developments will join up seamlessly with growing bulk handling and capacity at neighbouring Ridley Island, which also comprises a propane export terminal operated by AltaGas, exporting gas extracted in British Columbia and Alberta to markets throughout Asia.
机译:当局(PRPA)根据新的总体规划,将增加700万标准箱,并将在其南部的凯恩岛站点和西部的凯恩锦绣码头增加新容量。 DP World经营的Fairview码头目前为135万标准箱,根据与该码头巨头2018年达成的协议,到2022年将增至180万标准箱。但是,与基础设施顾问AECOM合作设计的一项新计划呼吁在凯恩岛的最南端开发一个新的250万标准箱的码头。这些发展将与邻近的雷德利岛的散装货物处理能力和容量的增加无缝结合,该岛还包括由AltaGas经营的丙烷出口码头,将不列颠哥伦比亚省和艾伯塔省提取的天然气出口到整个亚洲市场。

著录项

  • 来源
    《Dredging and Port Construction》 |2019年第605期|12-12|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号