首页> 外文期刊>Journal of Electrical Systems and Information Technology >Experimental evaluation of 8kW grid-connected photovoltaic system in Egypt
【24h】

Experimental evaluation of 8kW grid-connected photovoltaic system in Egypt

机译:埃及8 kW光伏并网光伏系统的实验评估

获取原文
获取外文期刊封面目录资料

摘要

An experimental observation study of 8 kW grid-connected photovoltaic (PV) system that is installed at Electronics Research Institute (ERI), Giza, Egypt (Latitude 30.04°N, Longitude 31.21°E), is presented. This study includes the quality of the electrical power generated and injected into the network. The considered system consists of 28 × 295 Wp multicrystalline PV modules, StecaGrid three-phase 8 kW grid-connected inverter and a Solar-Log 300 PM+ for data acquisition and remote monitoring. The power quality parameters at the inverter output side have been measured using CA8335 power quality analyzer. The system has been installed in August 2014 and generated 5.7 MWh till February 2015. The produced electricity by the system is injected directly into the grid without storage device. The purpose of this paper is to present and evaluate the measurements of the power quality parameters obtained from the PV site. Also, this paper presents a comprehensive evaluation of the performance of the system over a period of one week. The observation and analyses exploitation of the collected data can help to evaluate the performance of the PV system connected to the network.
机译:本文介绍了安装在埃及吉萨电子研究所(ERI)(纬度30.04°N,经度31.21°E)的8 kW并网光伏(PV)系统的实验观察研究。这项研究包括产生和注入网络的电能质量。所考虑的系统包括28×295 Wp的多晶硅光伏模块,StecaGrid三相8 kW并网逆变器以及用于数据采集和远程监控的Solar-Log 300 PM +。逆变器输出侧的电能质量参数已使用CA8335电能质量分析仪进行了测量。该系统已于2014年8月安装,到2015年2月发电量为5.7 MWh。该系统产生的电力无需存储设备即可直接注入电网。本文的目的是介绍和评估从光伏站点获得的电能质量参数的测量结果。另外,本文还对系统在一周内的性能进行了全面评估。观察和分析收集到的数据可以帮助评估连接到网络的光伏系统的性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号