首页> 外文期刊>Procedia CIRP >Variations as Activity Patterns: A Basis for Project Planning in PGE – Product Generation Engineering
【24h】

Variations as Activity Patterns: A Basis for Project Planning in PGE – Product Generation Engineering

机译:活动模式的差异:PGE中项目规划的基础–产品生成工程

获取原文
       

摘要

The model of PGE – Product Generation Engineering describes the development of new technical products as follows: subsystems from one or more existing technical systems are the basis and starting point for every development. This is referred to as the “reference system”. It determines the structure and subsystems of a new product or serves as a basis for new development activities, respectively. Considering the role of the reference system, a new technical product is a new product generation. The development of each of its subsystems is one of three types of variation: carry over variation, embodiment variation and principle variation. The latter two are the share of new development.The iPeM – integrated Product engineering Model describes the development as a combination of activities, e.g. “detect ideas”, “verify and validate” or “built up prototype”. This contribution investigates the relation between the three types of variation and the activities of product engineering, by answering the following research questions:?Which activities of product engineering are necessary to implement the different variations in PGE??Which factors influence this relationship between activities of product engineering and variations in PGE?Answers to these questions build up on interviews with eleven experts from development practice and two cases by authors of this contribution. The results show that the implementation of each variation in PGE includes several different activities of product engineering. Furthermore, this set of activities depends on the type of variation. Taking into account additional observations the idea of variations as company specific activity patterns is developed: each type of variation in PGE is related to a set of activities of product engineering where the characteristics of these relations depend on company-specific factors but can be similar across several development projects of this company. Hence, using those activity patterns process planning, including innovative potential, cost and risk estimation, is possible.
机译:PGE –产品生成工程模型描述了新技术产品的开发,如下所示:来自一个或多个现有技术系统的子系统是每次开发的基础和起点。这被称为“参考系统”。它确定新产品的结构和子系统,或分别作为新开发活动的基础。考虑到参考系统的作用,新技术产品就是新产品。它的每个子系统的开发都是三种类型的变化之一:继承变化,实施例变化和原理变化。后两个是新开发的份额。iPeM ​​–集成产品工程模型将开发描述为活动的组合,例如, “发现想法”,“验证和确认”或“建立原型”。该贡献通过回答以下研究问题来研究三种类型的变异与产品工程活动之间的关系:?为了实现PGE中的不同变异,必须进行哪些产品工程活动?哪些因素会影响产品活动之间的这种关系?产品工程和PGE的变体?这些问题的答案建立在对11位来自开发实践的专家的采访以及两位作者的案例的基础上。结果表明,PGE中每个变体的实施都包括产品工程的几种不同活动。此外,这组活动取决于变化的类型。考虑到其他观察结果,提出了随着公司特定活动模式而变化的想法:PGE中的每种类型的变化都与一组产品工程活动相关,其中这些关系的特征取决于公司特定因素,但在各个公司之间可能相似该公司的几个开发项目。因此,使用这些活动模式进行过程计划,包括创新潜力,成本和风险估计,是可能的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号