首页> 外文期刊>Civil and Environmental Engineering Reports >Scaffoldings Used During The Renovation Of The Metropolitan Cathedral Of St. John The Baptist And St. John The Evangelist In Lublin
【24h】

Scaffoldings Used During The Renovation Of The Metropolitan Cathedral Of St. John The Baptist And St. John The Evangelist In Lublin

机译:改造圣约翰施洗约翰大都会大教堂和圣约翰福音传教士在卢布林的脚手架

获取原文
       

摘要

This article describes three cases of scaffolding use as a structure for carrying out a renovation work at the Cathedral in Lublin. In order to achieve optimum access to the object, one used modular scaffolding. This type of scaffold is able to expand in any direction. In addition to the typical use, the scaffold was used as temporary roofing which allowed conducting the work during the winter. Monuments require a detailed approach to the problem of scaffolding. Despite the short period of use we should pay particular attention to the possibility of anchoring scaffoldings. Performing static calculation allows minimizing the number of anchors and used elements.
机译:本文介绍了三种脚手架案例,这些结构用作在卢布林大教堂进行翻新工作的结构。为了获得对物体的最佳访问,使用了一种模块化脚手架。这种类型的支架能够向任何方向扩展。除了一般用途外,脚手架还用作临时屋顶,可以在冬季进行施工。纪念碑要求对脚手架问题采取详细的处理方法。尽管使用时间很短,但我们仍应特别注意锚固脚手架的可能性。执行静态计算可以最大程度地减少锚点和所用元素的数量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号