...
首页> 外文期刊>Desalination >Blending and post-treatment protocols for SDWA compliance - Hollywood (FL) water plant
【24h】

Blending and post-treatment protocols for SDWA compliance - Hollywood (FL) water plant

机译:符合SDWA的混合和后处理方案-好莱坞(FL)水厂

获取原文
获取原文并翻译 | 示例

摘要

In 1988 the City of Hollywood, Florida prepared a 10-year water supply and treatment plan as a condition for renewal of its permit for consumptive use of the Biscayne Aquifer as raw supply to the City's 37.5 mgd lime softening plant. The three-phase plan which was adopted involves staged replacement of obsolescent softeners and filters with RO membranes, using both the Biscayne and the deeper, better contained, but brackish Floridan Aquifer as raw water supplies. Operating and blending protocols had to be developed which would ensure at all times during and after project implementation: Satisfaction of public water demand; water quality in compliance, present and future; Eastern Biscayne Aquifer withdrawal at or below current permitted amounts, with eventual curtailment; and residuals and concentrate disposal effected in an environmentally acceptable manner. These operating constraints, plus the unusual requirements for blending control make this project an important and instructive prototype for our changing water utility industry.
机译:1988年,佛罗里达州好莱坞市制定了一项为期10年的供水和处理计划,以此为条件,可以续用比斯坎含水层作为该市37.5 mgd石灰软化厂的原料水的消耗性使用许可。通过的三阶段计划涉及使用反渗透膜分阶段更换过时的软化剂和过滤器,同时使用比斯坎和更深,更好,但略带咸味的佛罗里达含水层作为原水供应。必须制定操作和混合方案,以确保在项目实施期间和之后的所有时间:满足公共用水需求;现在和将来的水质符合要求; Biscayne东部含水层的抽水量等于或低于当前允许的数量,最终被削减;残留物和浓缩物的处置以环境可接受的方式进行。这些操作限制以及混合控制的异常要求使该项目成为我们不断变化的自来水行业的重要且具有启发性的原型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号