首页> 外文期刊>Decision support systems >A multivariate approach for top-down project control using earned valuen management
【24h】

A multivariate approach for top-down project control using earned valuen management

机译:使用挣值管理的自上而下项目控制的多元方法

获取原文
获取原文并翻译 | 示例
       

摘要

Project monitoring and the related decision to proceed to corrective action are crucial components of an integrated project management and control decision support system (DSS). Earned value management/earned schedule (EVM/ES) is a project control methodology that is typically applied for top-down project schedule control. However, traditional models do not correctly account for the multivariate nature of the EVM/ES measurement system. We therefore propose a multivariate model for EVM/ES, which
机译:项目监视和采取纠正措施的相关决策是集成的项目管理和控制决策支持系统(DSS)的关键组成部分。挣值管理/挣进度表(EVM / ES)是一种项目控制方法,通常用于自上而下的项目进度控制。但是,传统模型无法正确说明EVM / ES测量系统的多元性质。因此,我们提出了EVM / ES的多元模型,

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号