Scheduling ontology development projects

机译:安排本体开发项目

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In the ontology engineering field, key aspects of real-world business contexts are not normally taken into account. One of these crucial aspects is that of planning and scheduling. Software engineering practitioners use different approaches and tools for planning and scheduling software development projects, whereas their counterparts in ontology engineering encounter many problems to create project plans and schedules. To bridge the gap we have created a method and a tool (the latter called gOntt) for systematizing the scheduling of ontology development projects in the context of the NeOn Methodology. In this paper we try to explain the methodological pillars in which method and tool are grounded. (C) 2016 Elsevier B.V. All rights reserved.
机译:在本体工程领域,通常不考虑实际业务环境的关键方面。这些关键方面之一是计划和调度。软件工程从业人员使用不同的方法和工具来计划和调度软件开发项目,而本体工程领域的同行在创建项目计划和进度表时遇到许多问题。为了弥合差距,我们创建了一种方法和工具(后者称为gOntt),用于在NeOn方法论的背景下系统化本体开发项目的调度。在本文中,我们试图解释以方法和工具为基础的方法论支柱。 (C)2016 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号