Excavation and Backfilling of a Large Temporary Bottom Outlet through Baglihar Concrete Dam under Reservoir Water Pressure

机译:水库水压下通过Baglihar混凝土大坝开挖和回填的大型临时底部出水口

获取原文
获取原文并翻译 | 示例
           

摘要

In this paper the excavation, closing and backfilling of a large temporary bottom outlet under water pressure through the then partially completed Baglihar concrete gravity dam in India is reported. The bottom outlet was used as a last resort to create a river diversion after both diversion tunnels were entirely blocked by landslides, and inundated with reservoir water. The 6.8m diameter bottom outlet is reported to be the largest passage ever to be driven through an existing concrete dam. Both the opening and closing of the passage below water level provided several challenges, and the technical details of its excavation, blasting, closing and backfilling are recorded. Moreover, a brief summary of similar works are provided. The experience collected from this challenging work may become useful not only for dam builders but also for tunnelling engineers.
机译:本文报道了在印度通过部分完工的Baglihar混凝土重力坝在水压下开挖,关闭和回填大型临时底部出水口的情况。在两个引水隧洞都被滑坡完全堵住并被水淹没之后,底部出口被用作最后的引水手段。据报道,直径6.8m的底部出口是有史以来通过现有混凝土大坝的最大通道。低于水位的通道的开启和关闭都带来了一些挑战,并且记录了其开挖,爆破,关闭和回填的技术细节。此外,提供了类似作品的简要概述。从这项具有挑战性的工作中收集的经验不仅可能对大坝建造者而且对隧道工程师也很有用。

著录项

  • 来源
    《Dam Engineering》 |2014年第4期|195-208|共14页
  • 作者

    Chongjiang Du; Bernhard Stabel;

  • 作者单位

    Lahmeyer International GmbH, Friedberger Str. 173, D-61118 Bad Vilbel, Germany;

    Lahmeyer International GmbH, Friedberger Str. 173, D-61118 Bad Vilbel, Germany;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号