What is Construction Schedule Control?

机译:什么是施工进度控制?

获取原文
获取原文并翻译 | 示例
           

摘要

Construction schedule control involves the effective use of schedules to plan, execute, measure, and report on the progress of a construction project. Effective schedules provide excellent planning tools and are the best communication tools in the field. Bar (Gantt) chart and critical path method (CPM) schedules are the more commonly used methods of scheduling in construction. Bar charts are a graphical representation of the schedule without demonstrating the relationships between the tasks. Scheduling software will allow you to display a CPM schedule in the form of a bar chart, so the old definition really does not apply anymore.
机译:施工进度控制涉及有效利用进度计划来计划,执行,衡量和报告建设项目的进度。有效的计划表提供了出色的计划工具,并且是该领域中最好的沟通工具。条形图(Gantt)和关键路径法(CPM)计划表是建筑中最常用的计划表方法。条形图是进度表的图形表示,没有演示任务之间的关系。排程软件可让您以条形图的形式显示CPM排程,因此旧定义实际上不再适用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号