首页> 外文期刊>Cost engineering >Claims Schedule Development and Analysis: Collapsed As-Built Scheduling for Beginners
【24h】

Claims Schedule Development and Analysis: Collapsed As-Built Scheduling for Beginners

机译:索赔进度表开发和分析:针对初学者的折叠式进度表

获取原文
获取原文并翻译 | 示例

摘要

One of the most prevalent ways of assessing and asserting claims is to analyze time delays suffered on a project. There are a number of methods by which this can be done. This artiele will touch on definitions of several of these methods. The thrust of this article, however, focuses on a method called the "collapsed as-built" schedule analysis, also known as the "but-for" schedule analysis. This type of analysis begins with creating or refining an as-built schedule, identifying delays and caused by a particular party, and then removing those delays from the schedule to illustrate how work on the project would have progressed, but for those identified delays.
机译:评估和主张索赔的最普遍的方法之一是分析项目遭受的时间延迟。有许多方法可以做到这一点。本文将探讨其中几种方法的定义。但是,本文的重点是一种称为“崩溃的已建成”进度表分析的方法,也称为“但为”进度表分析。这种类型的分析从创建或完善已完成的进度表开始,确定由特定方引起的延迟,然后从进度表中删除这些延迟以说明项目工作的进展情况,但对于已识别的延迟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号