Success: Use of Activity Code Structure for Project Schedule Integration and Monitoring

机译:成功:使用活动代码结构进行项目进度表集成和监视

获取原文
获取原文并翻译 | 示例
           

摘要

Production of an integrated project schedule in which all parties (multi-nationals) involved work and contribute effectively to the schedule is a challenge and a priority in major, large-scale, construction projects. This article describes the planning and scheduling processes and tools (software) that were applied prior to and during project execution, in successfully completing ahead of schedule, the first 2-unit CANDU 6 nuclear power plant in mainland China. The scope of the work involved included designing, procuring, constructing, and commissioning two 728 Mwe plants located on the shores of Hangzhou bay, 120 miles east of Shanghai in China.
机译:在所有大型(大型)建设项目中,要使所有各方(跨国公司)参与工作并为该时间表做出有效贡献,制定一个综合项目时间表是一项挑战,也是当务之急。本文介绍了在项目执行之前和执行过程中应用的计划和进度安排流程和工具(软件),以成功提前完成中国大陆第一座2单元CANDU 6核电站。涉及的工作范围包括设计,采购,建造和调试位于中国上海以东120英里的杭州湾沿岸的两家728 Mwe工厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号