How to Reduce Risk in Project Schedules and Portfolios

机译:如何降低项目进度表和项目组合中的风险

获取原文
获取原文并翻译 | 示例
       

摘要

Even the best-planned projects go wrong: every project manager knows that. Unexpectedly, from left field, comes a curveball -leaving plans, budgets and timescales in tatters. But it doesn't have to be that way. 'Unexpected' isn't the same as 'unimaginable,' or 'inconceivable.' For all too often, the things that go wrong in projects have indeed been foreseen as at least possibilities: in many projects, adverse factors such as bad weather, supplier unreliability and technical delays are ever-present dangers.
机译:即使是计划最周全的项目也会出错:每个项目经理都知道这一点。出乎意料的是,在左边的字段中出现了一个曲线球-将计划,预算和时间表分散在破烂中。但这不是必须的。 “意外”与“不可想象”或“不可思议”不同。实际上,至少在很多情况下,确实已经预见到了项目中出错的可能性:在许多项目中,不利的因素(如恶劣的天气,供应商的不可靠性和技术延迟)一直是危险。

著录项

  • 来源
    《Cost engineering》 |2007年第5期|p.14-15|共2页
  • 作者

    Sarim Khan;

  • 作者单位

    PertMaster;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 管理学;
  • 关键词

  • 入库时间 2022-08-18 01:05:13

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号