首页> 外文期刊>Cost engineering >Contractors' Perceptions of Construction Risks—A Case Study of Power Station Projects in Egypt
【24h】

Contractors' Perceptions of Construction Risks—A Case Study of Power Station Projects in Egypt

机译:承包商对施工风险的认识-以埃及电站项目为例

获取原文
获取原文并翻译 | 示例
       

摘要

The process of risk management is generally divided into three phases: risk identification, risk analysis, and risk response. Out of these three phases, the concept of risk identification appears to be the most known and practiced. This research focused on investigating how risks were perceived and managed by a large sample of Egyptian and international contractors who participated in the execution of two major power plant projects in Egypt. The results showed a marked lack of consistency in the contractors' risk identification effort. Furthermore, contractors possessing past experience in Egypt were far better able to identify the relevant risks. On the other hand, local Egyptian contractors with vast experience in Egypt, but limited project management experience, were shown to lack the necessary expertise to properly identify risks and to take the appropriate exceptions. The results showed a significant difference among the number of exceptions taken when Egyptian contractors were bidding independently, compared to those when they were part of a consortium with international contractors. Furthermore, the results demonstrated clearly that bidders do not include in their proposals their true lists of exceptions which represent genuine risks to them.
机译:风险管理的过程通常分为三个阶段:风险识别,风险分析和风险响应。在这三个阶段中,风险识别的概念似乎是最知名和实践的。这项研究的重点是调查参与埃及两个主要电厂项目执行的大量埃及和国际承包商如何看待和管理风险。结果表明,承包商的风险识别工作明显缺乏一致性。此外,在埃及拥有过往经验的承包商能够更好地确定相关风险。另一方面,埃及当地承包商在埃及拥有丰富的经验,但是项目管理经验有限,事实证明他们缺乏必要的专业知识来正确识别风险和采取适当的例外措施。结果表明,与埃及承包商与国际承包商组成财团的情况相比,埃及承包商在独立竞标时采取的例外处理数量有显着差异。此外,结果清楚地表明,投标人没有在其投标书中包括代表他们的真正风险的真实例外清单。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号