A Construction Management System For The Sprinter Project-a Case Study

机译:短跑运动员项目施工管理系统的案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

This article is a case study on how the construction management team on the Sprinter project developed a project control system allowing for a comprehensive documentation of contractor daily operations, analysis of progress and efficiency issues and monthly assessment of contractor's performance. This article will focus on the development, deployment, and implementation of a Sprinter Quantities Control System (SQCS) that was custom developed to aid the project controls professionals to monitor contractor progress on a monthly basis. This highly innovative system was developed to provide the project owner with a comprehensive progress analysis and evaluation intended to address project issues in a timely fashion and to ensure execution of the project in accordance with the currently approved project schedule. The Sprinter project converts 22 miles of existing freight rail alignment into a Diesel Multiple Unit (DMU) passenger rail system with service to 14 stations.
机译:本文是关于Sprinter项目的施工管理团队如何开发项目控制系统的案例研究,该系统可以全面记录承包商的日常运营,分析进度和效率问题以及每月评估承包商的绩效。本文将重点介绍Sprinter数量控制系统(SQCS)的开发,部署和实施,该系统是为帮助项目控制专业人员每月监督承包商的进度而定制开发的。开发这种高度创新的系统是为了为项目所有者提供全面的进度分析和评估,以及时解决项目问题并确保按照当前批准的项目进度执行项目。 Sprinter项目将22英里的现有货运铁路路线转换为柴油多单元(DMU)客运铁路系统,并为14个车站提供服务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号