Change Order Claims in the Egyptian Industrial Construction Sector: Causes and Cost/Time Overruns

机译:埃及工业建筑部门的变更单声明:原因和成本/时间超支

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

This research is targeted at providing a deeper insight into the status of change order claims, from the contractors' perspective, with respect to the Egyptian industrial construction sector. Change orders have been the main cause of claims in this sector. A questionnaire survey discussing the most persistent issues of change order claims management was conducted with a selected sample of Egyptian construction companies. Results revealed that additional scope of work was the main cause of change order claims. The study also identified several factors associated with significant cost and time increases on projects. These included time and material contracts and privately owned projects. Finally, the study presented several recommendations for improving change order claims management. The two main recommendations are to create a standard form of contract general conditions for the Egyptian industrial sector, and to apply a methodological approach for change orders quantification.
机译:这项研究的目的是从承包商的角度,针对埃及工业建筑行业,更深入地了解变更单声明的状态。变更单一直是该部门索赔的主要原因。对埃及建筑公司的一些样本进行了问卷调查,讨论了变更单索赔管理中最持久的问题。结果表明,额外的工作范围是变更单索赔的主要原因。该研究还确定了与项目的大量成本和时间增加相关的几个因素。这些包括时间和物质合同以及私人拥有的项目。最后,研究提出了一些改进变更单索赔管理的建议。两个主要建议是为埃及工业部门创建合同一般条件的标准形式,并为变更单量化应用方法学方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号