Timely Implementation of the National Environmental Policy Act Process Aids Project Success

机译:及时实施《国家环境政策法》程序可帮助项​​目取得成功

获取原文
获取原文并翻译 | 示例
           

摘要

Implementation of the US National Environmental Policy Act (NEPA) process can have a dramatic effect on a project's schedule and budget. Often, the NEPA process is not triggered early enough. Failure to properly plan for the NEPA process and to implement the requirements of the policy early in the project or program lifecycle results in schedule and cost impacts negatively affecting the baseline. There is currently no required timeframe for completing NEPA documentation. Since the inception of NEPA, the timeline for implementing has increased from just over two years to something in excess of five years. An organization implementing NEPA must have a collaborative effort where necessary in order to maintain an efficient process. In addition, communicating and involving the interested public about a proposed action is a major component of the NEPA process. As it is, the public maintains a high degree of suspicion regarding agencies' willingness to apply the NEPA process in the spirit that its founders intended. Study has shown that the early involvement of interested parties will increase a project's chances of staying on track in terms of schedule and budget. Programmatic efforts, such as cost and performance metric tracking of the NEPA process, can be especially beneficial to US federal agencies or large organizations with multiple, concurrent large-scale projects. It remains the goal of NEPA to promote excellent decision-making when evaluating projects that have the potential to significantly affect the environment. In order for NEPA to work as it was designed and provide the most benefit to a project or program, it is imperative to start the NEPA process early.
机译:美国国家环境政策法案(NEPA)流程的实施可能对项目的进度和预算产生巨大影响。通常,NEPA流程未尽早触发。如果未能在项目或计划生命周期的早期适当地规划NEPA流程并未能实施政策要求,则会对进度和成本产生负面影响,从而对基准产生负面影响。当前没有完成NEPA文档所需的时间表。自NEPA成立以来,实施时间表已从刚刚超过两年增加到超过五年。实施NEPA的组织必须在必要时进行协作,以维持有效的流程。此外,就拟议的行动进行沟通并吸引感兴趣的公众参与是NEPA流程的重要组成部分。实际上,公众对于机构是否愿意按照其创建者的意图实施NEPA程序持高度怀疑态度。研究表明,利益相关方的早期参与将增加项目在进度和预算方面保持进度的机会。 NEPA流程的成本和绩效指标跟踪等计划工作,对于美国联邦机构或拥有多个并发大型项目的大型组织尤其有利。在评估可能对环境造成重大影响的项目时,NEPA的目标仍然是促进出色的决策制定。为了使NEPA照原样工作并为项目或计划带来最大的收益,必须尽早启动NEPA流程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号