Owners rely on project reports in order to make decisions. However, reporting is often inadequate for this purpose. For example, there may be too much or too little information, which confuses the Board or executives. Data may be misrepresented, incomplete, unrecognized, not validated, or simply inaccurate. Owner oversight of projects requires accurate, timely, and relevant status reporting, yet all too often it is not provided. This article identifies common pitfalls in project reporting, discusses the differences between accounting and project management software capabilities, and provides guidelines for developing periodic, consistent, useful reports to upper management. This article was one of the technical presentations at the 2009 Annual Meeting in Seattle. It was presentation OWN.S02, and was a Women in Project Controls Task-force sponsored presentation.
机译:业主依靠项目报告来做出决定。但是,报告通常不足以实现此目的。例如,信息太多或太少,这会使董事会或高管感到困惑。数据可能会被歪曲,不完整,无法识别,未经验证或完全不准确。业主对项目的监督需要准确,及时和相关的状态报告,但往往没有提供。本文确定了项目报告中的常见陷阱,讨论了会计和项目管理软件功能之间的差异,并提供了向上层管理人员开发定期,一致,有用的报告的指南。本文是在西雅图2009年年会上的技术演讲之一。它是OWN.S02演示文稿,是项目控制工作小组中的女性赞助的演示文稿。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号