Journey Mapto a MoreMature ScheduleRisk Analysis(SRA) Process

机译:旅程地图多次成熟的时间表风险分析(SRA)流程

获取原文
获取原文并翻译 | 示例
           

摘要

Organizations vary in their appreciation of the potentialimpact of the risks that could affect their achieving timeand cost goals while completing the project’s scope. Thisarticle lays out a risk analysis maturity model that allowsorganizations to determine: (1) where they are todayon the scale from "not aware" to "advanced integratedcost-schedule risk analysis" and (2) where they want tobe, what is their optimal level of risk analysis maturity.The levels of maturity are described along with theirbenefits and properties including tools and outputs thatdistinguish them from other maturity levels. [For a briefdiscussion of cost risk maturity, see 13, p. 210]. This articledoes not mandate that organizations strive to achievefull advanced cost-schedule integration methods andtools (level 5) unless that is desired. Often some projectswill require more or less risk analysis maturity dependingon size, complexity, type of project or other criteria. Thisarticle was first presented as RISK.2890 at the 2018 AACEInternational Conference & Expo.
机译:组织对潜力的赞赏变化可能影响其实现时间的风险的影响完成项目范围的同时和成本目标。这文章制定了允许的风险分析成熟度模型组织确定:(1)他们今天的位置从“不知道”到“高级集成”的规模成本时间表风险分析“(2)他们想要的地方是,他们的风险分析成熟程度是多少。成熟程度与他们一起描述福利和属性包括工具和输出将它们与其他成熟度水平区分开来。 [简要讨论成本风险成熟度,见13,p。 210]。本文不授权组织努力实现完整的高级成本计划集成方法和工具(5级)除非需要。通常是一些项目取决于,需要更多或更少的风险分析到期大小,复杂性,项目类型或其他标准。这第一次在2018年的AACE中首先呈现为风险.2890国际会议和世博会。

著录项

  • 来源
    《Cost engineering》 |2019年第2期|8-17|共10页
  • 作者

    David T. Hulett;

  • 作者单位

    Hulett &Associates LLC;

  • 收录信息 美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号