首页> 外文期刊>Cost engineering >Maturity Assessment for Engineering Deliverables
【24h】

Maturity Assessment for Engineering Deliverables

机译:工程可交付成果的成熟度评估

获取原文
获取原文并翻译 | 示例
           

摘要

Over the last 60 years, AACE International has provided numerous recommendedpractices that have advanced the skills and knowledge of cost engineering. To providefurther enhancement to the practice of cost engineering, the authors have developeda maturity assessment tool based on AACE International’s Recommended Practice No.18R-97, Cost Estimate Classification System - As Applied in Engineering, Procurement,and Construction for the Process Industries. The Maturity Assessment for EngineeringDeliverables (MAED) tool, as introduced in this article, is a maturity methodology thatfurther defines the “Estimate Input Checklist and Maturity Matrix” as provided in RP 18R-97 (CECS). This Recommended Practice, complimented with the MAED, can be usedas a quantitative approach in determining the appropriate level of maturity required forimproved estimate accuracy and confidence, and project delivery success.
机译:在过去的60年里,AACE国际提供了许多推荐的提出了成本工程技能和知识的实践。提供作者促进了成本工程实践的进一步提高了基于AACE International推荐练习编号的成熟度评估工具18R-97,成本估算分类系统 - 应用于工程,采购,和工艺产业的建设。工程的到期日评估如本文所介绍的,可交付成果(MAED)工具是一种成熟方法进一步定义RP 18R-中提供的“估计输入清单和成熟矩阵”97(CEC)。可以使用这种推荐的练习,称为MAED,可以使用作为确定所需适当成熟程度的定量方法提高估计准确性和自信,项目交付成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号