首页> 外文期刊>Contractor >School jobs keep Haberberger hopping
【24h】

School jobs keep Haberberger hopping

机译:学校工作使哈伯伯格不断跳槽

获取原文
获取原文并翻译 | 示例
           

摘要

St. Louis — No more pencils, no more books means Haberberger Mechanical here starts working on high school retrofit projects that can take advantage of the summer vacation period. Haberberger is continuing work this summer on a boiler and pump retrofit that began in March at McCluer High School. In June, Haberberger began two more projects at Parkway Central High School and the University of Missouri-St. Louis. Each year the seasonal recess provides an opportune time for Haberberger to install or replace HVAC units in schools so classes aren't interrupted by the construction. The challenge of these projects is a strict eight-week timeframe that has to be met prior to the start of the new school year. To ensure this happens, a company spokesman said, Haberberger does extensive preplanning and early detection of any potential problems to help alleviate downtime during construction.
机译:圣路易斯-没有更多的铅笔,没有更多的书意味着Haberberger Mechanical从这里开始从事可以利用暑假的高中改造项目。 Haberberger今年夏天将继续进行从3月在McCluer高中开始的锅炉和泵的改造工作。六月,Haberberger在百汇中央高中和密苏里州圣大学开始了另外两个项目。路易每年的季节性休假为Haberberger提供了一个在学校安装或更换HVAC单元的适当时机,因此上课不会因建筑而中断。这些项目面临的挑战是在新学年开始之前必须严格遵守八周的时间表。为确保这种情况发生,公司发言人说,Haberberger进行了广泛的预先规划和对任何潜在问题的早期发现,以帮助减少施工期间的停机时间。

著录项

  • 来源
    《Contractor》 |2005年第7期|p.312|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 房屋建筑设备;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号