...
首页> 外文期刊>Contractor >Change order basics - Part 2
【24h】

Change order basics - Part 2

机译:变更单基础-第2部分

获取原文
获取原文并翻译 | 示例

摘要

Acommon belief among owners is that contractors love changes, so they can mark up costs to whatever the market will bear to make up for low initial bids. Contractors, on the other hand, often believe that owners use the change directive process to get a lot of extra work without having to pay for it or at least not without first putting contractors through the wringer. Yet changes are almost inevitable. They are so engrained in our industry that people don't often step back and consider the whole concept of changes, to see that they don't necessarily have to be a "given" and that contractors could exercise more control over how these are used in construction. Keep reading to find out what the seven myths and misunderstandings are about them.
机译:业主普遍认为承包商很喜欢变化,因此他们可以为任何市场愿意承担的费用标出成本,以弥补较低的初始出价。另一方面,承包商通常认为,业主使用变更指令流程无需支付费用即可获得很多额外的工作,或者至少不必先让承包商通过绞拧机即可。然而变化几乎是不可避免的。他们在我们的行业中根深蒂固,以至于人们不必经常退后一步来考虑变革的整个概念,以了解他们不一定是“给予”的,承包商可以对这些方法的使用方式进行更多控制施工中。继续阅读以了解关于它们的七个神话和误解。

著录项

  • 来源
    《Contractor 》 |2012年第2期| p.2635| 共2页
  • 作者

    Mike Callahan;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号