...
首页> 外文期刊>Contractor >Trimble Rockies Campus project leverages BIM technology
【24h】

Trimble Rockies Campus project leverages BIM technology

机译:Trimble Rockies校园项目利用BIM技术

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

With completion expected this month, the 125,000-sq. ft. four-story Trimble Rockies Campus facility was on a tight construction schedule. Outgrowing its current office facility, Trimble decided to build a larger campus across the street. In the design and construction phase of the project, the state-of-the-art facility used Trimble's own customer solutions to help expedite the construction process, leveraging collaboration of 25 different Trimble technologies to support design, site work, fabrication and construction, including building information modeling (BIM) tools and techniques, and BIM-to-field solutions to develop and document means and methods that maximize quality, work with competitive schedules and reduce costs.
机译:预计本月竣工的125,000平方米。楼高四层的Trimble Rockies校园设施建设进度紧张。 Trimble决定摆脱现有的办公设施,决定在马路对面建立一个更大的校园。在项目的设计和施工阶段,最先进的设施使用Trimble自己的客户解决方案来帮助加快施工过程,并利用25种不同的Trimble技术的协作来支持设计,现场工作,制造和施工,包括建筑信息模型(BIM)工具和技术,以及BIM现场解决方案,以开发和记录可最大限度提高质量,采用有竞争力的时间表并降低成本的手段和方法。

著录项

  • 来源
    《Contractor》 |2013年第5期|312|共2页
  • 作者

    JOHN MESENBRINK;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号