首页> 外文期刊>Contractor >Copper installation the right choice at Children's Hospital
【24h】

Copper installation the right choice at Children's Hospital

机译:铜管安装是儿童医院的正确选择

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Slated to open next month, the 425,000-sq. ft., five-story, 192-bed Nemours/A.I. duPont Hospital for Children expansion is an impressive example of how design/build team collaboration is key to the success of any installation. The first floor of the building will contain a new emergency department, atrium and retail and dining facility. The second through fifth floors each contain two wings of 24 inpatient beds. The second floor contains 32 beds of critical care PICU beds and 16 beds of step-down and med-surg beds. The new building is connected to the existing facility with a three-story connecting link. Plus, the expansion includes a 108,000-sq.ft., 188-car ground-level parking garage below the new addition.
机译:预计下个月开放,占地425,000平方米。平方英尺,五层,设有192张床的Nemours / A.I。杜邦儿童医院的扩建就是一个令人印象深刻的例子,说明设计/建造团队之间的协作如何成为任何安装成功的关键。大楼的一楼将包含一个新的急诊室,中庭以及零售和餐饮设施。从第二层到第五层各有两个侧翼,每个侧翼有24张病床。二楼包含32张重症监护病床,16张降压病床和急诊病床。新建筑物通过三层连接链路连接到现有设施。此外,扩建部分还包括在新扩建部分下方的108,000平方英尺,188辆地面停车库。

著录项

  • 来源
    《Contractor》 |2014年第9期|311|共2页
  • 作者

    JOHN MESENBRINK;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号