首页> 外文期刊>Contract Journal >No Cost Cuts On Crossrail Contracts
【24h】

No Cost Cuts On Crossrail Contracts

机译:Crossrail合同不削减成本

获取原文
获取原文并翻译 | 示例
           

摘要

The cost of Crossrail contracts will not be slashed despite the prediction of sharp falls in construction prices. Crossrail head of procurement Steve Rowsell said he would resist the temptation to alter the £16bn project's procurement strategy despite price deflation. He said: "We believe a two-stage approach,where you look at contractors" capability before moving into a commercial assessment,will still be important.It would be a backward step to focus on price as the driver. "It would be wrong to view this as a return to lowest price bidding and a chance to drive down costs to a position where they are unsustainable. "Unsustainable costs will come back and hit you in terms of lower quality or in terms of disputes and claims."
机译:尽管预计建筑价格会急剧下跌,但不会削减Crossrail合同的成本。 Crossrail采购主管史蒂夫·罗塞尔(Steve Rowsell)表示,尽管价格出现通缩,他仍将抵制改变160亿英镑项目采购策略的诱惑。他说:“在进入商业评估之前,“我们认为采用两阶段方法,即您可以查看承包商”的能力仍然很重要。将价格作为驱动力是一个落后的步骤。 “将其视为重新回到最低价格竞标,并且有机会将成本降低到无法持续的位置是错误的。”不可持续的成本会再次出现,并降低质量或引发纠纷,索赔。”

著录项

  • 来源
    《Contract Journal》 |2008年第6702期|p.2|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号