首页> 外文期刊>Contract Journal >Jarvis and Balfour go head to head for overhead line work
【24h】

Jarvis and Balfour go head to head for overhead line work

机译:贾维斯(Jarvis)和巴尔弗(Balfour)并肩作战架空线工作

获取原文
获取原文并翻译 | 示例
           

摘要

Jarvis and Balfour Beatty are braced for a showdown on the West Coast Mainline that will see one of them snatch the remainder of the overhead line engineering (OLE) works on the £750m improvement scheme. Network Rail blamed OLE works for a four-day overrun on repairs in January that sparked a storm of negative publicity and a £14m fine for the operator. Following the incident, Balfour Beatty was drafted in to pick up a share of the work alongside Jarvis. Network Rail has also threatened to cut agency staff and poor-performing contractors and warned that it would increase its in-house capability on the job, specifically among overhead line engineers.
机译:贾维斯(Jarvis)和巴尔弗·比蒂(Balfour Beatty)准备在西海岸干线上进行摊牌,他们中的一员将抢走7.5亿英镑改善计划中其余的架空线工程(OLE)工程。 Network Rail指责OLE在1月份进行了为期四天的超车维修,引发了负面宣传风暴,并向运营商罚款1400万英镑。事件发生后,巴尔福·比蒂(Balfour Beatty)被选入,与贾维斯(Jarvis)一起分担了一部分工作。 Network Rail还威胁要裁减代理商人员和表现不佳的承包商,并警告说它将提高其内部工作能力,特别是在高架线工程师中。

著录项

  • 来源
    《Contract Journal》 |2008年第6673期|p.3|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号