...
首页> 外文期刊>Contract Journal >Complex wave design will raise roof at London 2012
【24h】

Complex wave design will raise roof at London 2012

机译:复杂的波浪设计将在2012年伦敦奥运会上掀起屋顶

获取原文
获取原文并翻译 | 示例
           

摘要

Stories about building for the 2012 Olympics usually revolve around costs: budgets busted, millions redirected from worthier causes, taxpayers and Londoners shouldering the burden. The oft-quoted one about the Aquatics Centre goes like this: the budget started off at £75m - and now it's £303m.rnA visit to the Olympics Park now, as it begins to take shape, would surely enthuse the most cynical of old moaners. The sight of the Aquatics Centre, rising up out of what was an ageing hotch-potch of industrial units, is impressive, even uplifting. It reminds us that there is cause for celebration: we are hosting the Olympic Games. Here. In three years time.
机译:有关为2012年奥运会进行建设的故事通常围绕成本进行:预算破灭,数百万人从更有价值的事业中重新定向,纳税人和伦敦人承担了重担。经常被引用的关于水上运动中心的内容是这样的:预算始于7500万英镑,而现在是3.03亿英镑。现在,随着奥林匹克公园的初具规模,对奥林匹克公园的参观无疑会激起人们的最愤世嫉俗an吟。从一个老旧的工业单位中跃升出来的水上运动中心的景象令人印象深刻,甚至令人振奋。它提醒我们有理由庆祝:我们正在举办奥运会。这里。在三年的时间里。

著录项

  • 来源
    《Contract Journal》 |2009年第6729期|12-1315-16|共4页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号