首页> 外文期刊>Contract Journal >Steelwork contractors chase £30m Blackfriars bridge decking scheme
【24h】

Steelwork contractors chase £30m Blackfriars bridge decking scheme

机译:钢结构承包商追逐3000万英镑的Blackfriars桥面铺装计划

获取原文
获取原文并翻译 | 示例
           

摘要

Three specialist steelwork firms are vying for one of the largest package contracts on the £275m overhaul of Blackfriars station, a £30m job to replace the bridge decking.rnThe job, which has just gone out to tender, involves 9,000t of steel. It is thought to have attracted Cleveland Bridge, Watson Steel and William Hare.rnA winner is expected to be named in early summer.rnThe same firms are pricing a smaller deal to build canopies for the platforms. One source said: "Those are worth just a few million. The decking is the big one."
机译:三家专业的钢结构公司正在争夺Blackfriars站2.75亿英镑大修中最大的包装合同之一,这是一项价值3,000万英镑的工作,以更换桥面板。该工作刚刚招标,涉及9,000吨钢材。人们认为这吸引了克利夫兰大桥,沃森钢铁公司和威廉·哈尔公司。预计将在初夏获胜。这两家公司都在以较小的价格为平台建造顶篷。一位消息人士说:“这些资产价值只有几百万。装饰是最大的装饰。”

著录项

  • 来源
    《Contract Journal》 |2009年第6719期|10-10|共1页
  • 作者

    David Rogers;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号