Friday, April 1, approximately 6:00 p.m.: I arrive at the site, but find no one. I'm here to commission a new generator integrated with the existing electrical system at a healthcare facility. On initial inspection, I find two load banks in the outside alley behind the central plant. These will accommodate load bank testing. They include one large 2,000-kW adjustable and one 1,200-kW fixed load bank. The cables that will connect the load banks to the existing paralleling switchgear run along the ground, up the side of the central plant wall to the roof and into the gen-rator switchgear room.
机译:4月1日,星期五,大约下午6:00:我到达​​现场,但没有人发现。我是在医疗保健机构调试与现有电气系统集成的新发电机。初步检查时,我在中央工厂后面的外部小巷中找到了​​两个负载库。这些将适应负载库测试。它们包括一个2,000 kW的大型可调式负载和一个1,200 kW的固定负载组。将负载库连接到现有并联开关设备的电缆沿着地面延伸,从中央工厂墙壁的一侧到屋顶,再进入发电机开关设备室。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号