Hospital meets critical power needs

机译:医院满足关键的电力需求

获取原文
获取原文并翻译 | 示例

摘要

Phoenix Children's Hospital in Phoenix is both a healthcare facility and a high-rise building. As such, the facility's emergency power supply system (EPSS) must meet emergency standby requirements for both types of facilities. To meet these requirements the facility has a remote central energy plant housing most of its EPSS. The emergency power supply (EPS) consists of three 2 MW generators and medium-voltage paralleling gear and distribution. Unit substations are located throughout the facility with automatic transfer switches (ATS) located downstream of unit substation. Any of the three 2 MW generators can accommodate the requirements of NFPA 70 and NFPA 99 for the life safety branch and critical branch for the entire facility, There are also a variety of stored emergency power supply systems (SEPPSS).
机译:凤凰城的凤凰城儿童医院既是医疗机构,又是高层建筑。因此,设施的应急电源系统(EPSS)必须满足两种设施的紧急备用要求。为了满足这些要求,该工厂拥有一个偏远的中央能源工厂,其中容纳了其大部分EPSS。应急电源(EPS)由三台2 MW发电机,中压并联齿轮和配电装置组成。单元变电站遍布整个设施,而自动转换开关(ATS)位于单元变电站的下游。三台2 MW发电机中的任何一台都可以满足整个工厂的生命安全分支和关键分支的NFPA 70和NFPA 99的要求。此外,还有各种存储的应急电源系统(SEPPSS)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号