首页> 外文期刊>Consulting-specifying engineer >Tall order for super high-rises
【24h】

Tall order for super high-rises

机译:高层建筑的高订单

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

CSE: What engineering challenges do super high-rise buildings pose that are different from other structures? Paul Beam: The vertical distribution and transportation requirements are quite different. The riser space required to provide power, communications, conditioned air, and elevator access is considerable, and at odds with the desire to maximize usable building area. Super high-rise buildings must comply with building code requirements for increased structural integrity and additional sprinkler risers. The challenge is compounded by the change in space usage from floor to floor, which is typically encountered from parking levels, to lobby areas, to occupied spaces, to mechanical floors.
机译:CSE:与其他结构不同,超高层建筑带来哪些工程挑战?保罗·比恩(Paul Beam):垂直分布和运输要求完全不同。提供电源,通信,空调和电梯通道所需的提升空间很大,这与使可用建筑面积最大化的需求背道而驰。超高层建筑必须符合建筑规范的要求,以提高结构完整性并增加洒水喷头。楼层之间的空间使用变化使挑战更加复杂,通常是从停车场,大厅区域,占用空间到机械地板。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号