首页> 外文期刊>Consulting-specifying engineer >Designing energy plants the smart way
【24h】

Designing energy plants the smart way

机译:智能设计能源工厂

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

A critical review of the expected spectrum of operating loads, including the maximum design, average, low, and minimum loads, is necessary to develop a generating plant design. Low-load control is essential for efficient operation of heating and cooling plants and providing comfort during low-load and changeover conditions between heating and cooling. Complaints from occupants to maintenance personnel often peak during times of low load. Generally, low-load and changeover conditions occur for many hours during a year, many more times than high and low design loads. Low-load and changeover occurs when the outside temperature is between 45 and 75 F.
机译:为了制定发电厂的设计,有必要对预期的工作负荷范围进行严格审查,包括最大设计,平均,低和最小负荷。低负荷控制对于加热和冷却设备的高效运行以及在低负荷以及加热和冷却之间的转换条件下提供舒适感至关重要。在低负荷时,从乘员到维修人员的投诉通常会达到顶峰。通常,一年中的低负载和转换条件会持续数小时,这比高和低设计负载要多得多。当外部温度在45至75 F之间时,发生低负载和转换。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号