Commissioning, testing gensets using resistive/reactive load banks

机译:使用电阻/电抗性负载组进行调试,测试发电机组

获取原文
获取原文并翻译 | 示例

摘要

When examining the key differences between resistive and resistive/reactive load testing-and why the latter is necessary-it is important to focus on addressing a facility's emergency power generation system as a whole by testing the entire system to identify system-wide weaknesses at the time of commissioning and at periodic test intervals to comply with regu-latory agencies (see Figure 1). Reactive load testing is primarily important at health care facilities, data centers, life safety, and mission critical applications where the need to demonstrate the capability to provide electrical power as intended is prescribed by regulatory standards and codes specified by the designers. Examples of typical emergency power sources include gas- and diesel-fueled reciprocating engine generators, liquid- and gas-fueled turbine generators, rotary UPS, and battery UPS systems.
机译:在检查电阻性和电阻性/无功负载测试之间的主要区别(以及为何需要后者)时,重要的是要通过测试整个系统来识别设施的应急发电系统,以识别整个系统的弱点,这一点很重要。调试时间和定期测试间隔,以符合法规要求(见图1)。无功负载测试在医疗保健机构,数据中心,生命安全和关键任务应用中至关重要,在这些领域中,监管标准和设计人员指定的规范要求证明必须提供预期的供电能力。典型应急电源的示例包括汽油和柴油为燃料的往复式发动机发电机,液体和汽油为燃料的涡轮发电机,旋转式UPS和电池UPS系统。

著录项

  • 来源
    《Consulting-specifying engineer》 |2013年第10suppla期|12-14|共3页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号