首页> 外文期刊>Consulting-specifying engineer >Estimating data center PUE
【24h】

Estimating data center PUE

机译:估算数据中心PUE

获取原文
获取原文并翻译 | 示例
           

摘要

Socrates said, "The more I team, the more I learn how little I know." This quote can correlate strongly with the topic of estimating and analyzing data center energy use. Despite many years of experience, a definitive, detailed approach on how to estimate power usage effectiveness (PUE) in a project's early design phases is extremely elusive. Reports and articles typically focus on measuring energy use after a facility is operational. The Green Grid Association and ASHRAE offer a wealth of information on how to perform energy compliance analyses and how to use the data to determine PUE (see "For further reading"). However, applying this knowledge to an energy use simulation process takes a lot of reverse engineering and postulations on how the data center will actually function.
机译:苏格拉底说:“我的团队越多,我学到的知识就会越多。”该引用可以与估计和分析数据中心能源使用的主题紧密相关。尽管有多年的经验,但是关于如何在项目的早期设计阶段中估算功率使用效率(PUE)的确定,详细的方法却非常难以捉摸。报告和文章通常侧重于设施运营后的能源使用量测量。 Green Grid Association和ASHRAE提供了有关如何执行能源合规性分析以及如何使用数据确定PUE的大量信息(请参阅“进一步阅读”)。但是,将此知识应用于能源使用模拟过程需要进行大量的逆向工程,并假设数据中心将如何实际运行。

著录项

  • 来源
    《Consulting-specifying engineer》 |2013年第2期|A60-A62A64A66|共5页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号