【24h】

Focus on data centers

机译:专注于数据中心

获取原文
获取原文并翻译 | 示例
           

摘要

Cyrus Gerami: I recently worked with a national collocation client on a 180,000-sq-ft Tier 21 collocation data center in Fairfax County, Va. It is a four-story building with an infrastructure cellar and eight co-location suites (N+l MEP). The central chiller plant uses highly efficient magnetic oil-free compressors and evaporative condensers. Use of waterside and airside economizers is being closely evaluated. The facility power is backed up by eight 2.5 MW standby generators plus a ninth swing generator. In another project, for a national wireless phone company, we're working on a 21,000-sq-ft wireless company switch room expansion using a refrigerant cooled rear-door cooling system. At another wireless phone company, we are working on an $80 million expansion and renovation of an existing data center. This facility has an N+N redundancy capacity, which includes two separate utility power services and twice as many emergency power generators. The facility has 184,000 sq ft of building area with 70,000 sq ft of raised floor. Use of computer room air handler (CRAH) with airside economizer and ultrasonic evapo-
机译:赛勒斯·杰拉米(Cyrus Gerami):我最近与一个全国性的搭配客户合作,在弗吉尼亚州费尔法克斯县的一个180,000平方英尺的21层搭配数据中心。这是一栋四层楼的建筑,有一个基础设施地窖和八个同居套件(N + 1 MEP)。中央冷却器厂使用高效的无油磁性电磁压缩机和蒸发式冷凝器。水侧和空气侧节能器的使用正在严格评估中。八台2.5 MW备用发电机和第九台摆动发电机为该设施的电力提供了支持。在另一个项目中,对于一家国家无线电话公司,我们正在使用制冷剂冷却的后门冷却系统来扩展21,000平方英尺的无线公司交换室。在另一家无线电话公司中,我们正在进行8000万美元的扩建和翻新工作,以改造现有的数据中心。该设施具有N + N冗余能力,其中包括两个独立的市电服务和两倍的应急发电机。该设施的建筑面积为184,000平方英尺,活动地板为70,000平方英尺。将计算机室空气处理器(CRAH)与空气侧节能器和超声波蒸发器配合使用

著录项

  • 来源
    《Consulting-specifying engineer》 |2013年第1期|8-1013-17|共8页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号