首页> 外文期刊>Consulting-specifying engineer >CASE STUDY: BOILER SYSTEM DESIGN TO CONSTRAINTS
【24h】

CASE STUDY: BOILER SYSTEM DESIGN TO CONSTRAINTS

机译:案例研究:锅炉系统设计受约束

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Aboiler system design was requested for a large food manufacturer that required 140,000 lb/h of saturated steam. Saturated steam is steam supplied at the vapor/water saturation point for a given operating pressure. In this case the saturated steam at 90 psig was at 331 F and the 175 psig steam was at 377 F. Operations required that the full boiler capacity was 90 psig of saturated steam, but lower quantities of steam were required at 175 psig of steam for daily process plus 90 psig steam for building heat requirements. The full steam capacity is needed only quarterly for building sanitation requirements. Available plant space was ample, but limited in ceiling height. The system design was to include a new condensate collection system, makeup water treatment system, deaerator, and feedwater pumps.
机译:大型食品制造商要求使用沸腾器系统设计,该制造商需要140,000 lb / h的饱和蒸汽。对于给定的工作压力,饱和蒸汽是在蒸汽/水饱和点处供应的蒸汽。在这种情况下,90 psig的饱和蒸汽为331 F,175 psig的蒸汽为377F。操作要求锅炉的全部容量为90 psig的饱和蒸汽,但对于175 psig的蒸汽,所需的蒸汽量较少每天的处理过程,再加上90 psig的蒸汽来满足建筑物的热量需求。对于建筑物的卫生要求,仅每季度需要全部蒸汽容量。可用的设备空间充足,但天花板高度有限。该系统的设计将包括一个新的冷凝水收集系统,补充水处理系统,除氧器和给水泵。

著录项

  • 来源
    《Consulting-specifying engineer》 |2015年第3期|74-74|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号