首页> 外文期刊>The Construction Specifier >Collaborative Project Management Technology and teamwork
【24h】

Collaborative Project Management Technology and teamwork

机译:协作项目管理技术和团队合作

获取原文
获取原文并翻译 | 示例
           

摘要

Integrated and more overtly collaborative professional practices can be expected in planning, architecture, interior design, engineering, landscape architecture, construction, and facility management. Project management will be enhanced through round the clock Web sites with new procedures, protocols, and processes. Just a few years ago, integrated project delivery (IPD) was a novel concept, but it is now very much a part of the construction industry's vision. Integrated project delivery breaks down the silos dividing architect, engineer, and contractor, allowing for the complete sharing of project information. While this practice has typically been frowned on due to organizational tradition, the philosophy behind IPD reinvents the way in which these parties share information and allows them all to work in a single model contractually from the beginning to the end of the design-build (D-B) process.
机译:可以在规划,建筑,室内设计,工程,景观建筑,施工和设施管理中实现集成的,更加公开的协作专业实践。通过全天候使用新程序,协议和过程的网站,可以增强项目管理。就在几年前,集成项目交付(IPD)是一个新颖的概念,但是现在它已成为建筑行业远景的一部分。集成的项目交付可打破划分建筑师,工程师和承包商的孤岛,从而实现项目信息的完全共享。虽然这种做法通常由于组织传统而被反对,但是IPD背后的理念重新设计了这些各方共享信息的方式,并允许他们从设计到构建的开始到结束以合同方式在单个模型中工作(数据库) )过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号