Fast-track Construction: Confusion or Opportunity?

机译:快速通道建设:困惑还是机遇?

获取原文
获取原文并翻译 | 示例
           

摘要

The pace of construction projects is accelerating, as is much of our lives. For the last three decades, building owners have increasingly been selecting fast-track construction to minimize the overall time it takes for project delivery-despite inherent inefficiencies and limitations of this method. Fast-track construction has become so important that it has led to development of the first major new form of project delivery in many years. Integrated project delivery (IPD) is an attempt to improve coordination and optimize both design and construction schedules. Although there are differing relationships between owners, designers, and contractors, as expressed in various new American Institute of Architects (AIA) and ConsensusDoc contract forms, they all have fast-track construction as a common factor.
机译:建设项目的步伐正在加快,就像我们一生的大部分时间一样。在过去的三十年中,尽管这种方法固有的效率低下和局限性,但建筑所有者越来越多地选择快速施工,以最大程度地缩短项目交付所需的总时间。快速建设已变得如此重要,以至于导致多年以来开发了第一种主要的新项目交付形式。集成项目交付(IPD)旨在改善协调并优化设计和施工进度。尽管以各种新的美国建筑师协会(AIA)和ConsensusDoc合同形式表示的所有者,设计师和承包商之间存在着不同的关系,但它们都是快速施工的共同因素。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号