...
首页> 外文期刊>Construction manager >Members attend private view of new Belfast arts centre
【24h】

Members attend private view of new Belfast arts centre

机译:成员参加新的贝尔法斯特艺术中心的私人观景

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Belfast's Crescent Arts Centre opened to the general public in March following an 18-month restoration but members of Ireland's Northern Centre got a sneak preview of the work done to restore one of the city's most historic buildings. The 150-year-old structure has been renovated to 21 st century standards. Part three storey and part four storey, with Scrabo sandstone elevations and natural slate roof, the buildling was constructed in 1873 as a college and first opened as the Crescent Arts Centre (CAC) in 1978. A Bl listed building, it was in a poor state of repair with around half the floor area unusable. Over £4m of funding was secured to completely refurbish and extend the premises. The aim was to provide multipurpose spaces for visual, performance and creative arts, which include galleries, workshops, studios, offices and a cafe.
机译:贝尔法斯特的新月艺术中心经过18个月的修复后,于3月向公众开放,但爱尔兰北部中心的成员对修复这座城市历史最悠久的建筑之一所做的工作进行了预览。这座拥有150年历史的建筑经过了翻新,达到21世纪的标准。第三层和第四层具有Scrabo砂岩立面和天然石板屋顶,建于1873年,当时是一所大学,并于1978年首次开放为新月艺术中心(CAC)。修复状态,约一半的地板无法使用。已获得超过400万英镑的资金来完全翻新和扩建房屋。目的是为视觉,表演和创意艺术提供多功能空间,其中包括画廊,工作室,工作室,办公室和咖啡馆。

著录项

  • 来源
    《Construction manager》 |2010年第5期|p.51|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号